Today we continued on the trench around the foundation and started the second home site by clearing and moving the dirt to level it. Trees were cut to build a retaining wall to keep the dirt from falling. There was lots of pick axing, shoveling, using the machete to chop the trees and wheelbarowing the dirt. We have been blessed to be healthy and safe on the job site.
We got to know some of the workers (Jesus, Noel and Benito) and the children enjoyed painting and playing with Sofia.
We jumped in the pool after returning to the hotel which helped to cool us off and ate at Casa de todo.
The team is quite tired tonight after a full days work.